From: Antti on
Avnet is sole disti for Xilinx, now lets see what Avnet says:

searching for Spartan-6
all items are no stock, with notice factory leadtime 16 weeks
but some items have extra note, "stock in asia"
good this means there is stock?
but what does the "stock in asia" link do?

it opens a popup window saying: no stock,
factory leadtime 143 weeks!

143 weeks leadtime on spartan-6?

should we all smile or cry?

Antti
From: John Adair on
It's even better when that 143 week lead time comes through as a
formal quote. I have a number of Jan2013 delivery quotations. I'm sure
it's not as bad as that but the people on the ground at Avnet think
but they do go by their system quoted leadtimes.

Meanwhile I will announce a new Spartan-6 board later this week. We
have a limited supply of silicon sold to me by Nuho when they were
still franchaise but after that I guess it's maybe a wait until 2013.

John Adair
Enterpoint Ltd.


On 4 July, 10:18, Antti <antti.luk...(a)googlemail.com> wrote:
> Avnet is sole disti for Xilinx, now lets see what Avnet says:
>
> searching for Spartan-6
> all items are no stock, with notice factory leadtime 16 weeks
> but some items have extra note, "stock in asia"
> good this means there is stock?
> but what does the "stock in asia" link do?
>
> it opens a popup window saying: no stock,
> factory leadtime 143 weeks!
>
> 143 weeks leadtime on spartan-6?
>
> should we all smile or cry?
>
> Antti

From: Frank Buss on
Antti wrote:

> Avnet is sole disti for Xilinx, now lets see what Avnet says:
>
> searching for Spartan-6
> all items are no stock, with notice factory leadtime 16 weeks
> but some items have extra note, "stock in asia"
> good this means there is stock?
> but what does the "stock in asia" link do?
>
> it opens a popup window saying: no stock,
> factory leadtime 143 weeks!
>
> 143 weeks leadtime on spartan-6?
>
> should we all smile or cry?

Switch to Altera. I've never heard of delivery problems for the Cyclone 2,
which a customer is still using for a product which I helped to program.
Even for the latest Cyclone 4 there are already some chips available in the
Altera online shop. For the Cyclone 3 device there are hundreds of each
type in stock. Digikey, Farnell and other distributors have it in stock,
too.

16 weeks should be enough time for changing a design from one vendor to the
other, if you didn't use special features which are not available in the
other FPGA. And in the end you'll have a more FPGA independant design, if
you need to change it again :-)

--
Frank Buss, fb(a)frank-buss.de
http://www.frank-buss.de, http://www.it4-systems.de
From: Uwe Bonnes on
Antti <antti.lukats(a)googlemail.com> wrote:
> Avnet is sole disti for Xilinx, now lets see what Avnet says:

> searching for Spartan-6
> all items are no stock, with notice factory leadtime 16 weeks
> but some items have extra note, "stock in asia"
> good this means there is stock?
> but what does the "stock in asia" link do?

> it opens a popup window saying: no stock,
> factory leadtime 143 weeks!

> 143 weeks leadtime on spartan-6?

Digikey now also has 251 XC6SLX items. All not on stock, but must parts
scheduled around mid of august .
--
Uwe Bonnes bon(a)elektron.ikp.physik.tu-darmstadt.de

Institut fuer Kernphysik Schlossgartenstrasse 9 64289 Darmstadt
--------- Tel. 06151 162516 -------- Fax. 06151 164321 ----------
From: John Adair on
On some these they will come back and say order book isn't open.
That's what happened to me. I placed a pile of orders this way when
this list appeared mid-week as a emergency way to get silicon and an
alternative to Avnet. However I suspect, given what I have seen, that
they will meet these dates but you never know/

John Adair
Enterpoint Ltd.

On 4 July, 12:29, Uwe Bonnes <b...(a)elektron.ikp.physik.tu-
darmstadt.de> wrote:
> Antti <antti.luk...(a)googlemail.com> wrote:
> > Avnet is sole disti for Xilinx, now lets see what Avnet says:
> > searching for Spartan-6
> > all items are no stock, with notice factory leadtime 16 weeks
> > but some items have extra note, "stock in asia"
> > good this means there is stock?
> > but what does the "stock in asia" link do?
> > it opens a popup window saying: no stock,
> > factory leadtime 143 weeks!
> > 143 weeks leadtime on spartan-6?
>
> Digikey now also  has 251 XC6SLX items. All not on stock, but must parts
> scheduled around mid of august .
> --
> Uwe Bonnes                b...(a)elektron.ikp.physik.tu-darmstadt.de
>
> Institut fuer Kernphysik  Schlossgartenstrasse 9  64289 Darmstadt
> --------- Tel. 06151 162516 -------- Fax. 06151 164321 ----------